电梯导轨的正确安装
添加时间:2018/9/21 15:15:18     浏览次数:
电梯导轨的正确安装
Correct installation of elevator guide rail
1.1待装电梯导轨的检验电梯导轨(特别是轿厢导轨)在安装前须检查每根待装导轨的直线度不应超出l/6000,整根导轨其最大弯曲不超过0.6ram,并在任1000mm中弯曲度不应超出0.3ram(这对于现场导轨的正确堆放、搬运等都提有一定的要求);工地检测采用2块磁铁吸压一根细线在磁铁与金属垫片间,垫片再吸附与导轨被测工作面并将线拉直进行测量;水平测量时应考虑导轨自重所引起的弯曲,测量侧向工作面时应平躺、测量顶端工作面时应侧躺;扭曲校检可用两磁力水平、垂直仪吸附侧向工作面检查各段相对扭曲或将导轨卧躺用两水平仪测量两接导面相对水平。
1.1 inspection of elevator guide rail of elevator guide rail to be installed (especially car rails) must be inspected to be installed each guide rail straightness should not exceed L / 6000 before installation, the whole track the maximum bending of not more than 0.6ram, and at 1000mm in bending should not exceed 0.3ram (the right guide rail for the scene handling all piled up, there are certain requirements); site inspection by using 2 pieces of magnet suction pressure of a thread in the magnet and the metal gasket, gasket and adsorption and guide the measured working surface and line straightening measurements; level measurement should be taken into account when bending rail caused by measuring weight, lateral working face should be flat top, measuring working face should be the side lying check; twisted by two horizontal and vertical magnetic adsorption instrument lateral face check each relative distortion or lying two is connected with the guide rail measuring surface relative to the level two level.
若弯曲过大应在校正后方可安装;现场直线度、扭曲校正,只要点把握得准并不难,若存在有严重扭曲、弯头又实在无法校直情况可考虑更换或将其安装于井道最高或最低处。
If the bending is too large, it can be installed after correction. The straightening and straightening of the field is not difficult as long as the point is grasped accurately. If there is serious distortion and elbow, it can not be straightened directly, it can be considered to replace or install it in the highest or the lowest part of the well.
提吊导轨应采用绳索竖装,采用3人搬运并搬运时避免弹跳,严禁采用绳索索于导轨中心或2端处平行提吊。
The lifting guide rail should adopt the rope vertical installation, avoid jumping when carrying and carrying 3 people, and strictly prohibit the use of rope cable in the center of guide rail or parallel lifting at the 2 end.
导轨由底坑向上逐根立起(通常以雄口朝上,因雌口朝上易产生轿厢安全钳动作时啃坏导轨接口侧面),安装前应检查各导轨连接口是否损伤并将其清洗干净。
The guide rail is erected from the bottom pit to the top. (usually the male mouth is upwards. The female rail is prone to generate the side face of the guide rail when the female joint is upwards. The inspection should be done before the installation of the safety joint is damaged and cleaned.
1.2导轨正确的安装方法(1)以铅垂线为基准,检查逐根安装好的导轨与铅垂线的误差值,并逐根安装,逐根进行调整。方法为:支架处导轨校正到位一接导口直线度校正一支架处导轨校正等,避免(特别是高层)待导轨全部安装好后,如没进行调整(整列导轨从底至顶呈无数折线,折线长度大于直线),而导轨的预定位摩擦及自重的存在,使其下部导轨在校正时无法伸张造成弯曲、扭曲或虽已校正仅免强在导轨支架处,而整列导轨内部存在着弯曲、扭曲应力使各支架中间部分的导轨产生变形,特别在接导板处,弯力足够大时使接导板产生变形而完全无法达到导轨安装检验标准要求。
The correct installation method of 1.2 rail (1) with a plumb line as the base, the error checking by rail and the plumb line installed the value of the root, and by the root installation, adjusted by the root. Methods: the stent in place with a guide port rail correction a support rail straightness correction correction, avoid (especially high-rise) to guide all installed, if not adjusted (the entire column guide rail from bottom to top in numerous line, line length is greater than the straight line), and guide a friction and weight the existence of the school, the lower track caused by the bending distortion or has only correction on the rail bracket from not done is, and the entire column guide exists inside the bending and twisting stress to guide the support of the middle part of the deformation, especially in the plate, bending force is large enough to meet the guide deformation and completely unable to meet inspection standards require the installation guide.
上一页  电梯导轨分为三大类,这些知识电梯人应该知道  
下一页  直线导轨的四个优点
  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3

Copyright © 技术支持:遨游网络

  • 联系我们
  • 网上订单
  • 工程案例
  • 本站导航

搜索

  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3